Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink
Couldn't load pickup availability
Site Reviews
Site Reviews
At Oz Goods Depot, we’re proud to share real reviews from real customers. These reviews are collected from shoppers across all of our products and reflect genuine experiences with our store. Whether you’re browsing furniture, appliances, or everyday essentials, you can explore authentic Oz Goods Depot reviews below to see why customers across Australia continue to choose us with confidence.
Return & Refund Policy
Return & Refund Policy
We offer a 14-day change of mind return period, which means you have 14 days after receiving your item to request a return if you no longer want the product. This does not affect your rights under the Australian Consumer Law.
To be eligible for a change of mind return, your item must be unused, unassembled, in its original packaging, and in resalable condition, with all accessories included. Proof of purchase is required.
To start a return, please contact us at hello@ozgoodsdepot.com.au. Items sent back without prior approval will not be accepted.
Australian Consumer Law (ACL) returns.
Our goods come with guarantees that cannot be excluded under the Australian Consumer Law.
You are entitled to a remedy if a product is faulty, damaged in transit, significantly different from its description, or not of acceptable quality.
- Return courier costs and restocking fees do not apply to ACL returns
- The remedy provided (repair, replacement, or refund) depends on whether the issue is classified as a major or minor failure under the ACL
Damages and issues
Please inspect your order upon receipt and contact us as soon as possible if the item is defective, damaged, or incorrect, so we can assess the issue.
If a product is confirmed to be faulty, damaged in transit, or incorrect, return courier costs and restocking fees do not apply.
Exceptions / non-returnable items
The following items cannot be returned unless required under the Australian Consumer Law:
- Perishable goods (e.g. food, plants)
- Custom or personalised products
- Personal care or hygiene products
- Hazardous materials, flammable liquids, or gases
- Gift cards
- Clearance or sale items
If you are unsure whether your item is eligible for return, please contact us before requesting a return.
Change of mind returns
Change of mind returns are accepted within 14 days of delivery, provided the item is unused, unassembled, in original packaging, and in resalable condition.
Change of mind returns are subject to return courier costs and supplier restocking fees. These fees vary depending on the item’s size, weight, location, and supplier policy.
Applicable fees will be confirmed before collection is booked. If you do not wish to proceed, you may cancel the return request provided the collection has not yet occurred.
Original shipping charges are non-refundable. Large or bulky items may attract higher return courier and restocking fees.
Exchanges
We do not offer direct exchanges. The fastest way to obtain a different item is to return the original item (if eligible) and place a new order separately.
Refunds
Once your return is received and inspected, we will notify you of the outcome.
If approved, refunds will be issued to the original payment method within 10 business days. Processing times may vary depending on your bank or card provider.
If more than 15 business days have passed since your return was approved, please contact us at hello@ozgoodsdepot.com.au.
Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.
Features
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag
Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg
Package Content
Single Sleeping Bag x 1
Carry bag x 1
This product comes with 1 year warranty
SKU:SB-S-CURVE-PK
Share
